Analisis Faktor Keterlambatan Menggunakan Metode CPM pada Proyek Konstruksi Bangunan Gedung RKB MIN 5 Maluku Tengah
DOI:
https://doi.org/10.61722/jinu.v2i1.4056Keywords:
construction project, time, delays, CPMAbstract
A construction project is a series of interrelated activities to of interrelated activities to achieve goals within certain time, cost, and quality constraints. Constraints can also of a building. The construction of a classroom construction project with the aim of producing a physical building that meets the requirements of quality, cost, and time. Project delays caused by service providers, service users, and other parties involved in project activities can result in additional contract time and costs. Where delays in the project always result in losses experienced by all parties involved in the project. In this case, it is about what causes delays, demands for completion time and completion costs. Therefore, this research will analyze the delay factors using the CPM method on the RKB min 5 malteng building construction project which includes the levels of delay in the project.
References
A. Ridwan and A. Respati, Manajemen Proyek Konstruksi, Cetakan I. Kediri: CV Berkah Wisnu, 2020.
Agus Wibowo Wisudanto, (2020) Faktor-faktor Penyebab Keterlambatan pada Proyek Konstruksi Gedung di Kediri
Donald S. Barrie, Boyd C. Paulson, 1984, “Manajemen Konstruksi Profesional”, terj. Sudinarto, Erlangga, Jakarta
Ekawati, N. L. Y., Dharmayanti, C. G. A. P., & Yansen, I. W. (2015). Analisis Faktor-Faktor yang Mempengaruhi Keterlambatan Proyek Jalan Lingkungan Permukiman di Kabupaten Badung. Jurnal Spektran.
Farid Yudha Umbara, Moh Abduh. 2020” Analisis keterlambatan proyek besar nagwi menggunakan metode CPM (Critical Path Method), SENTRA
Gusni Vitri, Wendi Boy, Wiwin Putri Zayu. 2020 “Analisis Faktor penyebab keterlambatan pelaksanaan proyek rehabilitas sekolah dalam masa pandemi covid19. Jurnal Rab Contruction Resrch5 (2)
Ike, Parastiwi Ningsih, R.E.F.F.I. (2016). Analisa Penyebab Keterlambatan Proyek Pada Pembangunan Apartemen Royal Cityloft Dengan Menggunakan Metode Fault Tree Analysis. Jurnal Rekayasa Teknik Sipil.
Ismael, I. (2013). Keterlambatan Proyek Konstruksi Gedung Faktor Penyebab dan Tindakan Pencegahannya. Jurnal Momentum
Iswendra, & Noviarti, R. D. (2018). Proyek Pembangunan Gedung Cobalt Dan Linac Rsmh Palembang Dengan Menggunakan Metode Cpm.
Juansyah, Y., Karlia, D., & Rahmadi. (2018). Analisis Penyebab Terjadinya Keterlambatan Pelaksanaan Pekerjaan Proyek menggunakan Metode Analisis Faktor. Jurnal Rekayasa Teknologi dan sain
Liandy, F. (2018). Faktor-faktor penyebab keterlambatan pada proyek Jalan Tol Trans-Sumatera Segmen Palembang-Lampung. Bandung: Universitas Katolik Parahyangan
Messah, Y. A., Widodo, T., & Adoe, M. L. (2013). Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstuksi Gedung di Kota Kupang. Jurnal Teknik Sipil.
Rachman, D. N., & Iswendra. (2018). Analisis Penerapan Manajemen Waktu Pada Rencana Proyek Pembangunan Gedung Cobalt Dan Linac Rsmh Palembang Dengan Menggunakan Metode CPM. 8(2).
Rosanti, N., Setiawan, E., & Ayuningtyas, A. (2016). Penggunaan Metode Jalur Kritis Pada Manajemen Proyek.
Sugiyarto, S., Qomariyah, S., & Hamzah, F. (2013). Analisis network planning dengan cpm (critical path method) dalam rangka efisiensi waktu dan biaya proyek. Matriks Teknik Sipil, 1(4), 408
Wirabakti, D. M., Abdullah, R., & Maddeppungeng, A. (2014). Studi Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung.
Y. A. Messah, T. Widodo, and M. L. Adoe, “Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi Gedung di Kota Kupang,” J. Tek. Sipil, vol. II, no. 2, pp. 157–168, 2013.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 JURNAL ILMIAH NUSANTARA

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.