Analisis Kemampuan, Pengalaman dan Motivasi Melalui Produktivitas Tenaga Kerja pada Proyek Pembangunan Gedung Kantor Bahasa Provinsi Maluku
DOI:
https://doi.org/10.61722/jinu.v2i1.4110Keywords:
productivity, work ability, work experience, work motivationAbstract
The success rate of a construction project depends on labor productivity. Construction project labor is required to work effectively, efficiently and is expected to be in accordance with the plans that have been made. However, in reality found in the field, it is still less effective at work. This study aims to determine the effect of work ability, work experience and work motivation on labor productivity in the Construction of Maluku Province Language Building. In the field data collection is done by direct observation, while for the calculation of work volume using excel calculations. This research was also conducted by distributing questionnaires to the workforce to find out the factors that affect labor productivity. Questionnaire data was processed using SPSS version 25. From the results of the study, it was found that the volume of light brick installation work on labor productivity. Then obtained a total overall average of 15.9375 m2 / day. From the results of SPSS analysis obtained factors affecting labor productivity in the installation of lightweight bricks in the Construction of Language Building Maluku Province shows that the coefficient of determination (R2) value of 0.911. This means that 91.1% of the dependent variable in the form of work productivity in the construction of the language office building can be influenced by the variables of work ability, work experience and work motivation while the remaining 8.9% is influenced by other variables not included in this study.
References
Abriyani, Puspaningsih, 2004. "Faktor-faktor yang berpengaruh Terhadap Kepuasan Kerja Dan Kinerja Manajer Perusahaan Manufaktur", Jurnal Akuntansi dan Auditing Indonesia, Jakarta.
Gibson. 1997. Manajemen. Penerjemah: Zuhad Ichyaudin. Jilid I. Jakarta: Erlangga
Handoko, Hani dan Reksodiprodjo, Sukanto., 1996, Organisasi Perusahaan, Edisi Kedua Yogyakarta : BPEE
Hasibuan, Malayu, S.P., 1999, Organisasi dan Motivasi Dasar Peningkatan Produktivitas, PT. Bumi Aksara, Jakarta
Hasibuan, Malayu, S.P., 2002, Manajemen Sumber Daya Manusia, PT. Bumi Aksara, Jakarta
Herlina, Vivi. 2019. Panduan Praktis Mengolah Data Kuesioner Menggunakan SPSS. Jakarta : PT Elex Media Komputindo
Ilyas, Yaslis., 1999, Kinerja Teori Penilaian dan Penelitian, Fekom UI, Jakarta
Iskandar. 2009. Metodologi Penelitian Kualitatif. Gaung Persada press : Jakarta.
Kaming, 1997. Factors influencing craftsmen’s productivity in Indonesia. Internasional journal of project managemen
Mansyur, I., Serang, R., & Abdin, M. (2023). Pengaruh Motivasi Terhadap Produktivitas Kerja Pada Proyek Revitalisasi Rumah Susun Gudmura Paldam Kota Ambon. Menara: Jurnal Teknik Sipil, 18(1), 39-48.
Rahmadita, I. (2013). Hubungan Antara Konflik Peran Ganda Dan Dukungan Sosial Pasangan Dengan Motivasi Kerja Pada Karyawati Di Rumah Sakit Abdul Rivai-Berau. eJournal Psikologi. Vol 1, No 1, 2013: 58-68.
Robbins, Stephen P and Mary Coulter 2010. Manajemen. Edisi Kesepuluh, Jilid Dua. Pene;rbit Erlangga. Jakarta
Robbins, Stephen P., 1998, Organization Behavior, Concepts, Controvercies, Application, seventh edition, Englewood Cliffs
Sagir, Soeharsono., 1985, Kesempatan Kerja, Ketahanan Nasional dan Pembangunan Manusia Seutuhnya, Alumni Bandung
Salu, Milena Maria Sequeira, 2014, “Analisis Pengaruh Kerja terhadap Produktivitas Tenaga Kerja Proyek Konstruksi”, Skripsi, Universitas Atma Jaya Yogyakarta
Sedarmayanti, dkk. 2011.Metodologi Penelitian. Bandung : CV Mandar Maju
Sedarmayanti. 2009. Sumber Daya Manusia dan Produktivitas Kerja (3 rd ed). Bandung :CV. Mandar Maju
Siagian, S.P., 2002, Kiat Meningkatkan Produktivitas Kerja, PT. Rineka Cipta, Jakarta
Soeharto, I. 1995. Manajemen Proyek : Dari Konseptual Sampai Operasional. Jilid 1. Erlangga, Jakarta
Sugiyono. 2012. Memahami Penelitian Kuantitatif. Alfabeta : Bandung
Sugiyono. 2014. Metode Penelitian Pendidikan Pendekatan Kuantitatif Kualitatif, dan R & D. Alfabeta : Bandung.
Sujarweni, Wiratna. 2019. The Master Book Of SPSS. Yogyakarta : START UP 2019. Metodologi Penelitian Bisnis dan Ekonomi. Yogyakarta : Pustaka Baru
Suningan, Iman. 1995. Prouktivitas, apa dan bagaimana. Bumi Aksara : Jakarta.
Wardhani, Theresia. 2008. Sukses Meraih Peluang Kerja. Jakarta: Kanisius.
Zainullah, A, Agus dan Sugeng. 2012. Pengaruh Upah, Kemampuan dan Pengalaman Kerja terhadap Kinerja Pekerja Pelaksanaan Berkisting pada Pekerjaan Beton. rekayasasipil.ub.ac.id./index.php/rs/articl e/ view/213, diakses pada tanggal 26 Januari.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 JURNAL ILMIAH NUSANTARA

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.










