ANALISIS DAN MITIGASI RISIKO RANTAI PASOK PADA PEKERJAAN TANAH TIMBUNAN PROYEK KONSTRUKSI JALAN DENGAN METODE FMEA

Authors

  • Taufiq Arya Putra N Universitas Islam Indonesia
  • Fitri Nugraheni Universitas Islam Indonesia

DOI:

https://doi.org/10.61722/jinu.v2i6.6550

Keywords:

Delay, Risk, Supply Chain, FMEA, Roads

Abstract

Success in completing construction projects is influenced by many factors that are mutually dependent on each other, one of which is the supply chain. In 2018, the Public Works and Spatial Planning Department of West Sumatra Province, Indonesia had 24 road construction work packages. Only 33.3% were completed on time and the remaining 66.7% experienced delays, one of which was due to material delays (Rita et al., 2021). Embankment work on the Solo – Yogyakarta – YIA Kulon Progo Toll Road Project Section I Package 1.2 cannot be separated from the potential for delays. The supply chain is a special concern for this project, because the large material requirements and the difficulty of finding landfill material that meets specifications can become obstacles if the risks in each process are not managed well. The instrument used is Failure Mode and Effect Analysis (FMEA), namely by identifying failures in each process and the impacts that can occur on the activities carried out, so that mitigation actions can be determined to minimize risks that may occur. The research results showed that there are 5 supply chain activities for earth embankment work, namely raw materials, suppliers, manufacturing, distribution and consumers. There are 41 risks divided into 3 risk levels. At the raw material stage there are 4 medium risks and 2 high risks, at the supplier stage there are 7 medium risks, at the manufacturing stage there is 1 low risk and 6 medium risks, at the distribution stage there are 2 low risks and 11 medium risks, and at the consumer stage there are 8 moderate risk. There are 47 control measures which are divided into 5 aspects, namely Man, Money, Machine, Material and Method.

References

Arikunto S. 2013. Prosedur Penelitian: Suatu Pendekatan Praktik. Jakarta: Rineka Cipta.

Arikunto, S. 2002. Prosedur penelitian : Suatu pendekatan praktek. Edisi revisi. Jakarta: PT Rineka Cipta.

Arikunto, S. 2002. Prosedur penelitian : Suatu pendekatan praktek. Edisi revisi. Jakarta: PT Rineka Cipta.

Arikunto, S. 2010. Prosedur Penelitian Suatu Pendekatan Praktik. Jakarta: Rineka Cipta.

AS/NZS 4360:1999/ Risk Management in Security Risk Analysis. Brisbane, Australia:ISMCPI

Bogdan dan Taylor. 2012. Prosedur Penelitian. Dalam Moleong, Pendekatan Kualitatif. (him. 4). Jakarta: Rineka Cipta.

Candra, A. (2021). Analisis Manajemen Rantai Pasok Garam Konsumsi Beryodium CV Jelajah Alam di Desa Kubang Jaya Kabupaten Kampar – Riau. Universitas Islam Riau.

Carlson, Carl. (2012). Effective FMEAs: Achieving safe, Reliable, and economical products and processes using failure mode and effect analysis. Canada: United State of America.

Chapman, C. and Ward, S. (2003) Project Risk Management: Processes, Techniques and Insights. John Wiley & Sons Ltd., Chichester.

Chen, I.J. and Paulraj, A. (2004) Towards a Theory of Supply Chain Management: The Constructs and Measurements. Journal of Operations Management, 22, 119. http://dx.doi.org/10.1016/j.jom.2003.12.007

Creswell, J. W. (2012). Educational research: Planning, conducting, and evaluating quantitative and qualitative research (4th ed.). Boston, MA: Pearson.

Dannyanti, E. 2010. Optimalisasi Pelaksanaan Proyek dengan Metode PERT dan CPM (Studi kasus Twin Tower Building Pasca Sarjana Undip), Universitas Diponegoro. Semarang.

Dempsey & Dempsey. (2002). Validitas Data Edisi 4 . Jakarta: EGC.

Direktorat Jenderal Bina Marga. 2018. Spesifikasi Umum 2018 Untuk Pekerjaan Konstruksi Jalan dan Jembatan (Revisi 2). Jakarta Selatan : Kementrian Pekerjaan Umum dan Perumahan Rakyat Direktorat Jenderal Bina Marga."

Ervianto, W. 2005. Manajemen Proyek Konstruksi. Penerbit : Andi. Yogyakarta.

Fauzi, M. (2021). Analisis dan Mitigasi Risiko Rantai Pasok Produk Makanan Beku dengan Metode Failure Mode and Effect Ananlysis di CV Fania Group Kotagede. Universitas Islam Negeri Sunan Kalijaga.

Godfrey, T. and West, S. (1996) Introduction to industrial enzymology. Industrial enzymology, Mac. Millan Press, London, 1-8.

Hyatt, N. 2003. Guidelines for Process Hazards Analysis (PHA, HAZOP), Hazards Identification, and Risk Analysis: CRC Press

Kartam, N.A. and Kartam, S.A. (2001) Risk and Its Management in the Kuwaiti Construction Industry: A Contractors’ Perspective. International Journal of Project Management (Compendex), 19, 325-335.

Kurniawan, H., & Anggraeni, I. A. A. (2020). Analisis Risiko Rantai Pasok Material Terhadap Keterlambatan Pelaksanaan Proyek Konstruksi. Rekayasa Sipil, 14(1), 43–50. https://doi.org/10.21776/ub.rekayasasipil.2020.014.01.6

Leedy, P. D. (1997). Practical research: Planning and design (6th Edition). New Jersey: Prentice-Hall.

Mayudha (2022) Analisis Kinerja Supply Chain Proses Pengiriman Barang PT.XYZ Menggunakan SCOR MODEL.

Mayudha, M. (2022). Analisis Kinerja Supply Chain Pada Proses Pengiriman. Universitas Islam Indonesia.

McDermott, Robin.E, dkk, 2009. The Basics of FMEA. Edisi 2. CRC Press. United States of America.

Mulyana, Dedy. 2013. Metodologi Penelitian Kualitatif: Paradigma Baru Ilmu Komunikasi dan Ilmu Sosial Lainnya. Bandung: PT Remaja Rosdakarya.

Nurhayati, 2010. Manajemen Proyek. Penerbit Graha Ilmu. Yogyakarta.

Palisungan, A., Dundu, A. K. T., Willar, D., (2020). Rantai Pasok Material dengan Pendekatan Manajemen Risisko pada Pembangunan Bangunan Pengaman Pantai Miangas. Jurnal Ilmiah Media Engineering, 10(2), 151–164.

Parenreng, S.M., (2016), Model Pengelolaan Risiko Supply Chain Mempertimbangkan Kepentingan Multistakeholder Pada Komoditas Tuna, Penelitian Disertasi, Institut Teknologi Sepuluh Nopember, Surabaya.

Peraturan Presiden Nomor 16 Tahun 2018 Tentang Pengadaan Barang dan Jasa Pemerintah.

Piątkowski, J., & Kamiński, P. (2017). Risk Assessment of Defect Occurrences in Engine Piston Castings by FMEA Method. 107–110. https://doi.org/10.1515/afe2017-0100

Pradesa, E. (2021). Analisis Manajemen Risiko dalam Aliran Rantai Pasok Pengadaan Material Proyek Konstruksi. Universitas Pembangunan Nasional “Veteran.”

Project Management Institute. 1992. A User’s Manual to The PMBOK Guide. United State of America

Pujawan, I Nyoman dan mahendrawathi ER. (2010). Supply Chain Management. Edisi 2. Surabaya:Guna Widya

Refdizalis, R., Ophiyandri, T., & Hesna, Y. (2020). Studi Perilaku Rantai Pasok Konstruksi Pada Proyek Pembangunan Gedung. Jurnal Talenta Sipil, 3(2), 58. https://doi.org/10.33087/talentasipil.v3i2.30

Rita, E., Carlo, N., & Nandi. (2021). Penyebab dan Dampak Keterlambatan Pekerjaan Jalan di Sumatera Barat Indonesia. Jurnal Rekayasa, 11(1), 27–37. https://doi.org/10.37037/jrftsp.v11i1.94

Soeharto, Iman., 1999, Manajemen Proyek Dari Konseptual Sampai Operasional. Erlangga, Jakarta.

Sugiyono. (2012). Metode Penelitian Kuantitatif Kualitatif dan R&D. Bandung: Penerbit Alfabeta.

Sugiyono. (2013). Metode Penelitian Pendidikan (Pendekatan Kuantitatif, Kualitatif dan R&D). Bandung: Alfabeta."

Sugiyono. (2014). Metode Penelitian Pendidikan Pendekatan Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta.

Sugiyono. (2016). Metode Penelitian Kuantitatif, Kualitatif dan R&D. Bandung: PT Alfabet

Sukmadinata, Nana Syaodih. 2009. Metode Penelitian Pendidikan. Bandung : Remaja Rosdakarya

Supriyati. 2015. Metodelogi Penelitian. Bandung: Labkat Press.

Sutoni, A., & Kurniadi, D. R. (2020). Analisis Risiko dalam Construction Supply Chain : Studi Kasus Pada Proyek Renovasi Gedung Kantor VEDCA. Jurnal Media Teknik dan Sistem Industri, 3(2), 81. https://doi.org/10.35194/jmtsi.v3i2.772

Vaughan, E.J, Elliot, C.M. (1978). Fundamental of Risk and Insurance. New York:Wiley, John & Sons, Incorporated.

Waters, D. (2007). Supply Chain Risk Management: Vulnerability and Resilience. The Chartered Institute of Logistics and Transportation, London, 35-50.

Williams Jr., C. A., Smith, M. L., & Young, P. C. (1998). Risk Management and Insurance (8th Edition). Boston, MA: Irwin McGraw-Hill.

Yin, R. K. (2009). “Case Study Research: Design and Method” (4rd ed.). California: Sage Publications, Inc.

Yin, R.K. (2012) Case study methods. In Cooper, H., et al. (Eds.), APA Handbooks in Psychology. APA Handbook of Research Methods in Psychology, Vol. 2. Research Designs: Quantitative, Qualitative, Neuropsychological, and Biological, American Psychological Association, 141-155. https://doi.org/10.1037/13620-009

Yin, R.K. (2013) Case Study Research: Design and Methods. Sage Publications, Thousand Oaks.

Yin, R.K. (2013) Case Study Research: Design and Methods. Sage Publications, Thousand Oaks.

Yusdi, M. (2022). Analisis Nilai Tambah dan Mitigasi Risiko dengan Pendekatan HOR & AHP pada Rantai Pasok Beras di Kabupaten Pinrang. Universitas Hasanuddin.

Downloads

Published

2025-09-11