Penerapan Klausula Force Majeure Akibat Keterlambatan Perizinan Ekspor: Studi Kasus PT Freeport Indonesia
DOI:
https://doi.org/10.61722/jinu.v3i1.7288Keywords:
force majeure, export permit delay, government action, commercial contracts, PT Freeport IndonesiaAbstract
This article examines the application of the force majeure clause in PT Freeport Indonesia’s export contracts when delays in export permits arise from government actions. The study focuses on two central issues: whether such delays can be classified as force majeure, and how the clause is implemented within Freeport’s commodity contracts. Based on an analysis of contract law doctrine, the Indonesian Civil Code, and international commercial practices, the delay in export permits satisfies the elements of force majeure because it originates from government policies beyond the company’s control, is unforeseeable, unavoidable, and results in the temporary impossibility of performing delivery obligations. The contractual practices of Freeport further show that the force majeure clause is structured to anticipate government intervention through mechanisms such as formal notification, proof of non-negligence on the part of the company, and adjustments to delivery schedules once permits are reinstated. The findings confirm that the force majeure clause functions as an effective legal tool to protect Freeport and maintain the stability of international trade relations amid fluctuating mineral export regulations. This study highlights the need for more precise and adaptive drafting of force majeure clauses to address regulatory uncertainty in the mining sector.
References
Bagenda, C., dkk. (2024). Analisis yuridis terhadap pembatalan perjanjian berdasarkan keadaan memaksa (force majeure). Jurnal Kolaboratif Sains. https://jurnal.unismuhpalu.ac.id/index.php/JKS/article/view/6569
Prestasi akibat larangan ekspor ditinjau dari hukum positif Indonesia. (2024). Jurnal Aliansi. https://journal.appihi.or.id/index.php/Aliansi/article/view/60
Nofianti, L. (2023). Ketentuan force majeure dalam kontrak bisnis. Justici: Jurnal Ilmu Hukum. https://ejournal.iba.ac.id/index.php/justici/article/view/627
Ernawati, E. (2020). Konsepsi force majeure dalam kontrak/perjanjian di masa pandemi. Sol Justicia. https://ojs.ukb.ac.id/index.php/sol/article/view/290
Satrio, J. (1999). Hukum perikatan: Perikatan pada umumnya. Alumni.
Hernoko, A. Y. (2006). Force majeure clause atau hardship clause: Problematika dalam perancangan kontrak bisnis. Perspektif. https://jurnal-perspektif.org/index.php/perspektif/article/view/276
Setiawan, R. (1987). Pokok-pokok hukum perikatan. Binacipta.
UNIDROIT. (2016). UNIDROIT Principles of International Commercial Contracts 2016. UNIDROIT. https://www.unidroit.org/wp-content/uploads/2021/06/Unidroit-Principles-2016-English-bl.pdf
Bisnis.com. (2025, 3 Januari). Izin ekspor konsentrat Freeport habis, ESDM belum beri perpanjangan. https://ekonomi.bisnis.com/read/20250103/44/1828681/izin-ekspor-konsentrat-freeport-habis-esdm-belum-beri-perpanjangan
Bisnis.com. (2025, 7 Maret). Bahlil resmi perpanjang izin ekspor konsentrat Freeport, berapa kuotanya? https://ekonomi.bisnis.com/read/20250307/44/1859239/bahlil-resmi-perpanjang-izin-ekspor-konsentrat-freeport-berapa-kuotanya
Al-Ahmad, M., & Ismail, H. (2024). Kemungkinan mempertimbangkan keputusan administratif sebagai penerapan kehendak sepihak yang menciptakan kewajiban. Jurnal Universitas Raparin. https://doi.org/10.26750/vol(11).no(6).paper37
Meyer, O. (2016). The Unidroit Principles as a means to interpret or supplement domestic law. Uniform Law Review, 21, 599–611. https://doi.org/10.1093/ulr/unw051
Hennings, W., Abdellatif, S., & Hanna, A. (2022). Proper risk allocation: Force majeure clause. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000527
Syahputra, A. E., Harahap, N., & Syah, D. (2023). Tinjauan yuridis penerapan keadaan memaksa (force majeur) pada perjanjian konstruksi peningkatan jalan (Studi Putusan MA RI Nomor 2241 K/Pdt/2020). Jurnal Hukum Al-Hikmah, 4(4), 1093–1109.
Sujoko, A. (2023). Potensi sengketa terkait keadaan kahar (force majeure) dalam kontrak pengadaan pemerintah. Jurnal Pengadaan Indonesia, 2(2), 73–83.
Jusuf, M. F. F. (2025). Penggunaan klausul force majeure dalam pelaksanaan kontrak pada masa pandemi COVID-19. Al-Zayn: Jurnal Ilmu Sosial & Hukum, 3(5), 6177–6189.
Zainudin, M. F. (2022). Force majeure sebagai alasan tidak dilaksanakannya suatu kontrak ditinjau dari perspektif hukum perdata di Indonesia (Disertasi doktor, Universitas Gresik).
Downloads
Published
Issue
Section
License
Copyright (c) 2025 JURNAL ILMIAH NUSANTARA

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.










