ANALISIS ESTIMASI BIAYA DALAM PENETAPAN HARGA JUAL

Authors

  • Athari Putra Anugrah Universitas Muhammadiyah Sidoarjo
  • Muhammad Iqbal A.D Universitas Muhammadiyah Sidoarjo
  • Ribangun Bamban Jakaria Universitas Muhammadiyah Sidoarjo

DOI:

https://doi.org/10.61722/jirs.v1i3.763

Keywords:

Harga Pokok Produksi, full costing, Break Even Point

Abstract


Abstrak. Cost analysis and estimation is needed to determine the amount of production costs, cost of production, Break Even Point and determine the profit of a product. This research aims to determine cost estimates in determining selling prices. In collecting data, the author used documentation techniques and interviews. To answer existing problems, the author will conduct an analysis. From the results of the research that has been carried out, it can be concluded that the procedure for determining the cost of production according to the company is lower compared to calculating the cost of production using the full costing methode (Maddeppungeng and Suryani 2016)
Keywords: Cost of Goods Production, full costing, Break Even Point

Abstrak. Analisis dan estimasi biaya diperlukan untuk mengetahui besar biaya produksi, harga pokok produksi, Break Even Point dan mengetahui profit suatu produk. Penelitian ini bertujuan untuk mengetahui estimasi biaya dalam penetapan harga jual. Dalam mengumpulkan data, penulis menggunakan teknik dokumentasi, dan wawancara. untuk menjawab permasalahan yang ada, penulis akan melakukan analisis. Dari hasil penelitian yang telah dilakukan, dapat ditarik kesimpulan bahwa prosedur penentuan harga0pokok produksi menurut perusahaan lebih rendah dibandingkan=dengan perhitungan harga pokok;produksi dengan]menggunakan metode full costing (Maddeppungeng and Suryani 2016).
Kata Kunci: Harga Pokok Produksi, full costing, Break Even Point

References

A. Maddeppungeng and I. Suryani, “ESTIMASI BIAYA PADA PROYEK PERUMAHAN (Studi Kasus Proyek Pembangunan Citra Serang Residence),” Fondasi J. Tek. Sipil, vol. 5, no. 1, pp. 79–86, 2016, doi: 10.36055/jft.v5i1.1249.

C. Yuliana, A. Z. Ulimaz, and H. R. Kartadipura, “Estimasi Biaya Dengan Menggunakan Cost Significant Model Pada Pekerjaan Pemeliharaan Jalan Di Kota Banjarbaru,” Sustain. Technol. Journal), vol. 24, no. 1, pp. 24–30, 2020, [Online]. Available: http://jtb.ulm.ac.id/index.php/JTB

P. A. Eman, L. Elisabeth, and F. Jansen, “Estimasi Biaya Konstruksi Menggunakan Metode Parameter Pada Proyek Pemeliharaan Berkala Jalan Di Kota Manado,” J. Ilm. Media Eng., vol. 8, no. 2, p. 1033, 2018.

Sugiyarto, A. Muali, and W. Hartono, “Estimasi Biaya Konstruksi Bangunan Gedung Dengan Metode Cost Significant Model,” p. 498, 2016.

I. W. Jawat and N. Suwitanujaya, “Estimasi Biaya Pencegahan Dan Pengawasan K3 Pada Proyek Konstruksi,” Padur. J. Tek. Sipil Univ. Warmadewa, vol. 7, no. 1, pp. 88–101, 2018,

Downloads

Published

2024-01-10

Issue

Section

Articles