Perencanaan Design Dan Analisa Anggaran Biaya Menggunakan Metode Bow Untuk Pembangunan Musholla Baitul Makmur
Keywords:
RAB; BOW; Baitul Makmur Prayer RoomAbstract
The prayer room is a sacred building where Muslims hold worship. The building is relatively smaller than the mosque so its capacity can only accommodate a maximum of 50 people. The problem with the prayer room is that the prayer room will be built with limited funds because it is purely self-help and little is received from external assistance. So it is necessary to carry out preliminary planning that is related to the budget and cost allocation so that in the future the building does not stop in the middle of the road. This research aims to carry out cost planning so that the prayer room building is in accordance with the plan and the costs used do not exceed the existing costs. This research uses the BOW method, which is a method that provides a comprehensive framework for understanding and planning all aspects of development. The result of this research is to build a Baitul Makmur prayer room on empty land amounting to IDR 354,102,500. The budgeted costs include the cost of building foundations until they are completed so they can be used.
References
Agustapraja, H. R., Kartikasari, D., & Lubis, Z. (2020). Perbandingan Estimasi Anggaran Biaya Antara Metode Bow, Sni. 13(2), 2620–4770.
Alami, N., Aziz, U. A., & Margiarti, D. (2021). Studi Komparasi Perbandingan Rencana Anggaran Biaya Antara Metode Analisa Harga Satuan Pekerjaan (AHSP) Dan Standar Nasional Indonesia (SNI). 5, 10. http://files/198/Alami et al. - 2021 - Studi Komparasi Perbandingan Rencana Anggaran Biay.pdf
Dwiky Suhermawan, & Hammam Rofiqi Agustapraja. (2023). Evaluasi Perbandingan Anggaran Biaya Konstruksi Antara Metode SNI Dengan Metode Kontraktor. Jurnal Teknik, 21(1), 92–101. https://doi.org/10.37031/jt.v21i1.339
Eryck, M. F., Lakudo, K., & Al-fatah, M. (2021). Perencanaan Design Musholah Al-Fatah Sdn 20 Lakudo Desa Madongka Kecamatan Lakudo Kabupaten Buton Tengah. Jurnal Pengabdian Masyarakat Membangun Negeri, 5(1), 184–188.
Fasira, E., & Djaelani, M. (2023). Rencana Anggaran Biaya Dengan Metode Burgerlijke Openbare Werken (BOW) dan Analisa Harga Satuan Pekerjaan (AHSP) 2022 Dengan Proyek Pembangunan Asrama Putra Yayasan Sosial Sabilillah An-Nahdliyah Sidoarjo. Jurnal Ilmiah Multidisiplin, 1(11), 50–53. https://doi.org/10.5281/zenodo.10205920
Fatonah, K., & Wulansari, D. N. (2017). Estimasi Anggaran Biaya Struktur Proyek Pembangunan Hotel Quad Makassar Menggunakan Metode SNI. Jurnal Kajian Teknik Sipil, 2(2), 116–129.
Fitriono, F., Haza, Z. F., & Shulhan, M. A. (2023). Analisis Perbandingan Rencana Anggaran Biaya ( RAB ) Metode Konvensional Dengan Metode Building Information Modeling ( BIM ) ( Studi Kasus Gedung 3 Lantai Di Yogyakarta ). Jurnal Ilmu Teknik Sipil Surya Beton, 7(1), 13–24.
Hartanto, A. (2018). Analisis Rencana Anggaran Biaya (Rab) Proyek Sebagai Alat Perencanaan Dan Pengendalian Biaya (Studi Kasus Pada Pt. Griya Sentosa Property). Journal of Chemical Information and Modeling, 53(9), 1689–1699. http://garuda.ristekbrin.go.id/documents/detail/404965
Journal, R. T., Perbandingan, A., Biaya, A., Sni, M., Bow, D., Proyek, P., Alfin, N., Teknik, P., Fakultas, S., Universitas, T., & Bonang, S. (2022). http://jurnal.umsb.ac.id/index.php/RANGTEKNIKJOURNAL. 5(2), 248–266.
Juansyah, Y., Fadilasari, D., & Imron, J. (2022). Analisa Perbandingan Rencana Anggaran Biaya Menggunakan Indeks Harga Satuan Pekerjaan Standar SNI 2008 Dan Standar BOW Pada Proyek Pembangunan Talud Pantai 1 Bintuhan. Teknika Sains: Jurnal Ilmu Teknik, 7(1), 1–8. https://doi.org/10.24967/teksis.v7i1.1497
Krisnawan, D. C., & Agustapraja, H. R. (2020). Perbandingan Anggaran Biaya Pembangunan Gedung Dengan Menggunakan Nilai Bow, Sni Dan Harga Pasar (Studi Kasus Di Gedung Pasca Sarjana Unisla). Jcebt, 4(September), 80–84.
Laboratorium, G., & Samarinda, B. (1945). Abstrak.
Menggunakan, D., Bow, M., & Kontraktor, D. P. (2023). Perbandingan Rencana Anggaran Biaya Pada Pekerjaan Rehabilitasi Gedung Kantor Balai Perikanan Budidaya Air Tawar Tatelu. 21(86).
Mochamad Djaelani, & Ella Anastasya Sinambela. (2022). Rencana Anggaran Biaya dengan Metode BOW pada Pembangunan Ruang Kelas Baru Universitas Sunan Giri Surabaya. Jurnal Penelitian Rumpun Ilmu Teknik, 1(3), 60–67. https://doi.org/10.55606/juprit.v1i3.615
Mokolensang, V. M., Arsjad, T. T., & Malingkas, G. Y. (2021). Analisis Rencana Anggaran Biaya Pada Proyek Pembangunan Rumah Susun Papua 1 Di Distrik Muara Tami Kota Jayapura Provinsi Papua. Jurnal Sipil Statik, 9(4), 619–624.
Mufaris, A., Prihesnanto, F., & Darma, E. (2016). Perbandingan Estimasi Anggaran Biaya Antara Bow, Sni Dan Metode Perhitungan Kontraktor Pada Proyek Rumah Susun (Rusun) Pulogebang Jakarta Timur. Teknik Sipil Universitas Islam, 4(1), 262556.
Putra, D., & Sembiring, E. (2017). Perancangan Aplikasi Perhitungan Rencana Anggaran Biaya (RAB) Pembangunan Rumah Dengan Metode Burgerlijkeopenbare Werken (BOW). Pelita Informatika Budi Darma, 16(1), 16–20.
Rencana Anggaran Biaya Metode Bow, P., KONTRAKTOR PADA PROYEK PENINGKATAN JALAN GURINDAM BATAM CENTER Suriyanti, D., & Jaya Saputra, A. (2023). L E A D E R Civil Engineering and Architecture Journal. Civil Engineering and Architecture Journal, April, 69–75. https://doi.org/10.37253/leader.v1i1.7729
Roehman, F. (2011). Analisa Harga Satuan Pekerjaan dengan Metode Bow, Sni, dan Lapangan (Pekerjaan Beton Bertulang Pada Pembangunan Rumah Tinggal Perum Bugel, Jepara). Jurnal Teknik - UNISFAT, 7(1), 14–23. https://media.neliti.com/media/publications/221681-analisa-harga-satuan-pekerjaan-dengan-me.pdf
Rurianti, D. V., & Adinata, S. (2022). Perencanaan dan analisa anggaran biaya untuk pembangunan mesjid di rumah tahfiz al- qur’an al -atqiya desa logas. Jurnal Planologi Dan Sipil (Jps), 4(1), 70–83. https://ejournal.uniks.ac.id/index.php/JPS/article/view/2518
Downloads
Published
Issue
Section
License
Copyright (c) 2023 JURNAL ILMIAH RESEARCH STUDENT

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.









