Analisa Waktu Pelaksanaan Preservasi Jalan Namlea - Marloso - Mako - Modanmohe – Namrole

Authors

  • Novita Sari Jurusan Teknik Sipil, Politeknik Negeri Ambon
  • Octovianus Jamlaay Jurusan Teknik Sipil, Polieknik Negeri Ambon
  • Henriette Dorothy Titaley Jurusan Teknik Sipil, Polieknik Negeri Ambon

DOI:

https://doi.org/10.61722/jmia.v2i1.4011

Keywords:

critical path method, crashing, overtime

Abstract

Unwanted challenges are frequently encountered during the execution of building projects, one of which is the occurrence of delays brought on by a variety of circumstances, such as minor equipment damage and personnel shortages. To overcome this, alternative options are needed that can be used to complete the project such as adding working hours (overtime). The case study in this study is the Namlea - Marloso - Mako - Modanmohe - Namrole Road Preservation project. This study analyzes the implementation time using the CPM (critical path method) method and the crashing method. The data needed in this study include the S curve, a recapitulation of project cost calculations, a list of Budget Plans (RAB), analysis of work unit prices and a list of wages for workers and heavy equipment. The purpose of this study is to obtain the duration of the implementation time using the CPM method, identify critical paths and then carry out crashing to obtain the duration of the acceleration time with the alternative of adding 3 hours of overtime. From the results of the analysis carried out using the CPM method, the implementation time was obtained for 359 days (51 weeks) and consisted of 1 critical path with 12 activities. The crashing method is only focused on labor-intensive activities with an alternative of adding 3 hours of overtime. After acceleration with the crashing method, a duration of 345 days (49 weeks) was obtained, a reduction of 14 days from the normal duration of 359 days (51 weeks).

References

Caroles, I. L. (2022). Pengantar Preservasi Dan Survey Kondisi Jalan. wawasan Ilmu.

Hasanudin, M. R. (2023). ANALISIS KETEPATAN WAKTU DENGAN KONSEP NILAI HASIL UNTUK PROYEK JALAN (STUDI KASUS: PRESERVASI JALAN LIANG ANGGANG–MARTAPURA–BTS KOTA RANTAU) (Doctoral dissertation, Universitas Islam Kalimantan MAB).

Irawan, Y. A., & Juara, A. (2022). Analisa Optimasi Biaya Dan Waktu Metode TCTO (Time Cost Trade Off)(Study Kasus: Preservasi Jalan Ruas Sp. Gunung Kemala–Sanggi). Jurnal Civil Engineering Study, 2(02), 60-66.

Manus, J. S. M., Marsaoly, N., & Hakim, R. (2022). Analisis Faktor Keterlambatan Pekerjaan Preservasi Jalan Weda-Sagea Berdasarkan Persepsi Stakeholder. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 5(1), 51-59.

Maslina, M., Pratiwi, R., & Ridho, A. M. (2023). ANALISIS PENJADWALAN PROYEK REHABILITASI JALAN PRESERVASI JALAN KERANG –KUARO KALIMANTAN TIMUR MENGGUNAKAN METODE PDM DAN PERT: SCHEDULING ANALYSIS OF THE REHABILITATION PROJECT PRESERVATION ROAD KERANG ROAD –KUARO EAST KALIMANTAN USING PDM AND PERT METHODS. Jurnal Ilmiah Teknik Sipil TRANSUKMA, 5(2), 94-104.

Nainggolan, T. H., & Iskandar, T. (2020). ANALISIS PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN GALIAN DRAINASE DAN TIMBUNAN PILIHAN PROYEK JALAN (Studi Kasus: Preservasi dan Pelebaran Jalan Kamal-Bangkalan Kota Sampang Madura STA 21+ 750= 22+ 950). STUDENT JOURNAL GELAGAR, 2(2), 284-291.

Sulistiono, W. (2023). Perubahan Waktu Pada Pelaksanaan Preservasi/Peningkatan Terminal Penumpang Tipe A Samarinda Seberang di Samarinda Dengan Metode Penanganan Konflik. Jurnal Ilmiah Ecosystem, 23(1), 52-59.

Tamatompol, J. G., Dundu, A. K., & Mangare, J. B. (2023). Analisis Manajemen Material Dengan Menggunakan Lot for Lot Pada Proyek Preservasi Jalan Simpang Niam-Lubuk Kambing 1, Jambi. TEKNO, 21(83), 89-97.

Yunus, A., Said, L. B., & Alifuddin, A. (2022). Analisis penentuan penanganan jalan nasional metode international roughness index (IRI) dan pavement condition index (PCI): Studi kasus: ruas jalan Kalukku-Bts Kota Mamuju. Jurnal Konstruksi: Teknik, Infrastruktur dan Sains, 1(1), 10-21.

Downloads

Published

2025-02-06

Issue

Section

Articles