RENCANA ANGGARAN BIAYA DAN TIME SCHEDULE PEMBANGUNAN GEDUNG 5 LANTAI REKTORAT UNIVERSITAS HASYIM ASY’ARI

Authors

  • Tah Sin Hal Universitas Hasyim Asy'ari
  • Titin Sundari Universitas Hasyim Asy’ari

DOI:

https://doi.org/10.61722/jmia.v2i5.6688

Keywords:

Planning, Construction Management, Cost Budget Plan (RAB), Scheduling (Time Schedule)

Abstract

Construction project activity planning is very important because activity planning or scheduling is a key factor for the project to run smoothly and the project being implemented can be completed within the optimal time. In planning the implementation of this project work, the final results are in the form of time and costs of implementation in accordance with the planned method. In calculating the budget plan for the construction of a 5-story Rectorate Building at Hasyim Asy'ari University with a building area of ​​± 1230 m², accuracy is required in calculating the volume of work. Unit prices for work and wages also require complete drawing references. For work without available analysis, it is necessary to conduct your own analysis calculations and price surveys to obtain appropriate estimates, such as for mobilization and demobilization work items. Based on these calculations, the total cost required is Rp24,509,796,848.92. The time schedule, which is a time allocation plan to complete all work items in the project, is displayed in the form of an S-curve. From the preparation of this time schedule, it is estimated that the construction project of the 5-story Rectorate Building at Hasyim Asy'ari University will require 234 days to complete..

References

Alami, N., Aziz, U. A., & Margiarti, D. (2021). Studi Komparasi Perbandingan Rencana Anggaran Biaya Antara Metode Analisa Harga Satuan Pekerjaan (AHSP) Dan Standar Nasional Indonesia (SNI). 5, 10. http://files/198/Alami et al. - 2021 - Studi Komparasi Perbandingan Rencana Anggaran Biay.pdf

Eka Sutrisna. (2016). Analisis Time Schedule Proyek Pembangunan. Analisis Time Schedule Proyek Pembangunan Gedung Vip Rsud Cideres Kabupaten Majalengka, 399–408.

Elfira Safitri, Sri Basriati, & Latifah Hanum. (2019). Optimasi Penjadwalan Proyek menggunakan CPM dan PDM (Studi Kasus: Pembangunan Gedung Balai Nikah dan Manasik Haji KUA Kecamatan Kateman Kabupaten Indragiri Hilir). Jurnal Sains Matematika dan Statistika, 5(2), 17–25.

Elviyanti, Iqbal Abdurrauf Zulikasio, & Helny Lalan. (2023). Analisa Schedule Dengan Precendence Diagram Method (Pdm) Proyek Gedung Oleh Pt.X. Journal of Scientech Research and Development, 5(1), 449–458. https://doi.org/10.56670/jsrd.v5i1.152

Fahrian, Haryanto, B., & Jamal, M. (2021). Perbandingan Penjadwalan Proyek Dengan Metode PDM (Precedence Diagram Method) & CPM (Critical Path Method) (Studi Kasus: Lanjutan Pembangunan Proyek Gedung SD Islamic Center Samarinda). Jurnal Teknologi Sipil, 5(2), 17–25.

Fitriyana, T., Rafie, & Pratiwi, R. (2019). Analisis Manajemen Konstruksi Pembangunan Gedung Polresta Pontianak dengan Perhitungan S.N.I. dan Analisa Software Microsoft Project 2016. Jurnal PWK, Laut, Sipil, Tambang, 6(3), 1–4.

Harmawanto, J., Setianto Poernomo, Y. C., & Winarto, S. (2019). Analisa Anggaran Biaya Danpenjadwalanproyek Perbaikan Tanggul Kali Bakungdesa Cengkok Kecamatan Tarokan Kabupaten Kediri. Jurnal Manajemen Teknologi & Teknik

Sipil, 2(2), 224. https://doi.org/10.30737/jurmateks.v2i2.514

Ma’mury, S. S., & Firmanto, A. (2017). Analisis Manajemen Konstruksi Proyek Pembangunan PT. Tempoland Cirebon. VI(7), 651–668.

Manumpil, T. O., Mangare, J. B., & Arsjad, T. T. (2022). Analisis Penjadwalan Proyek Menggunakan Metode PDM Dengan Konsep Cadangan Waktu Pada Proyek Pembangunan Gedung Dokter Polisi Rumah Sakit Bhayangkara Kota Manado. Tekno, 20(81), 301–315.

Mokolensang, V. M., Arsjad, T. T., & Malingkas, G. Y. (2021). Analisis Rencana Anggaran Biaya Pada Proyek Pembangunan Rumah Susun Papua 1 Di Distrik Muara Tami Kota Jayapura Provinsi Papua. Jurnal Sipil Statik, 9(4), 619–624.

Nurhidayat, A., Arianto, B., & Bhirawa, D. A. N. W. T. (2013). Optimalisasi Pembangunan Proyek Apartemen Sgc Cibubur Dengan Menggunakan Metode Precedence Diagram Method (Pdm). Jurnal TeknikIndustri, 10(1), 22–32. https://doi.org/10.35968/jtin/v11i1/706

Radityo, F. R., & Zuhdy, A. Y. (2023). Perhitungan Waktu dan Anggaran Biaya Pelaksanaan Pada Proyek Gedung Perpustakaan Digital UINSA, Jalan Ahmad Yani no.117, Jemur Wonosari, Kota Surabaya. Jurnal Teknik ITS, 12(2), 129–

https://doi.org/10.12962/j23373539.v12i2.109808

Ratag, K. A., Malingkas, G. Y., & Tjakra, J. (2021). Perbandingan Rencana Anggaran Biaya Antara Metode SNI Dengan Metode AHSP Pada Proyek Gedung Pendidikan Fakultas Teknik. Tekno, 19(79), 299–305.

Rizky, M., Tarigan, A. P. M., & Hasibuan, G. C. R. (2024). Analisis Optimasi Penjadwalan dengan Metode Precedence Diagram Method pada Proyek Konstruksi Pembangunan Rumah Sakit Regina Maris Medan. Jurnal Syntax Admiration, 5(1), 126–139. https://doi.org/10.46799/jsa.v5i1.981

Sopacua, F. (2020). Perbandingan Rencana Anggaran Biaya Dengan Metode SNI

Dan Rencana Anggaran Pelaksanaan Kontraktor Pada Pembangunan Pengganti Bangunan Di Yonif 611/AWL Kompi Senapan A Dan C Di Samarinda Seberang. Jurnal Universitas 17 Agustus 1945, 1–9.

Tirani, & Sera. (2021). Perencanaan Manajemen Konstruksi Gedung Wisma Atlet 5 (Lima) Lantai Di Jalan Karet Kota Pontianak (Planning of Construction Management Building Wisma Atlete 5 (Five) Floor on Road Rubber Pontianak City). 2(1), 1–7.

Tuelah, J. D. P., Tjakra, J., & Walangitan, D. R. O. (2014). Peranan Konsultan Manejemen Konstruksi pada Tahap Pelaksanaan Proyek PEmbangunan (Studi KAsus : The Lagoon Taman Sari). Tekno Sipil, 12(61), 47–54.

Utomo, F. P., & Mulyono. (2021). Penjadwalan Ulang Proyek Konstruksi Menggunakan Metode PDM Dan CPM (Studi Kasus Pada Pembangunan Toserba Yogya Di Pekalongan). Ujm, 10(1), 63–72. http://journal.unnes.ac.id/sju/index.php/ujm

Vidiansyah, S. W., Trijanto, D., & Wahiddin, W. (2021). Perencanaan Struktur Bangunan Atas, Rencana Anggaran Biaya Dan Penjadwalan Gedung Hotel 5 Lantai Di Jalan Soekarno Hatta Kota Malang. Jurnal JOS-MRK, 2(4), 28–32. https://doi.org/10.55404/jos-mrk.2021.02.04.28-32

Yuliana, A. (2016). Analisis Penerapan Manajemen Proyek Rekonstruksi Pada Ruas Jalan Kwandang Molingkapoto Prov. Gorontalo. Radial - Jurnal Peradaban Sains, Rekayasa, dan Teknologi, 4(1), 72–78.

Downloads

Published

2025-10-06

Issue

Section

Articles