ANALISIS KERUSAKAN DAN PERAWATAN MESIN INVESTMEN CASTING MENGGUNAKAN METODE PREVENTIVE MAINTENANCE OPTIMIZATION (PMO) PADA DEPARTEMEN DIE CASTING PT. MITRAMETAL PERKASA

Authors

  • Indra Prasetia Universitas Teknologi Yogyakarta

DOI:

https://doi.org/10.61722/jrme.v3i4.10713

Keywords:

Investment Casting, Preventive Maintenance Optimization (PMO), Mean Time To Failure (MTTF), Machine Reliability, Downtime

Abstract

Production machine reliability is a fundamental factor in maintaining operational continuity within the manufacturing industry. PT. Mitrametal Perkasa, specifically in the Die Casting Department, faces challenges due to the high rate of sudden breakdowns in investment casting machines. This condition results in significant downtime and increased operational costs because the current maintenance strategy remains largely reactive. This study aims to analyze machine failure patterns and determine optimal maintenance intervals using the Preventive Maintenance Optimization (PMO) method. Research data were sourced from the 2025 machine maintenance performance reports, analyzed using reliability parameters such as Mean Time To Failure (MTTF) and Mean Time To Repair (MTTR). The results indicate that determining maintenance intervals based on historical data through the PMO approach provides more accurate maintenance schedule recommendations compared to conventional schedules. The implementation of this strategy is expected to enhance machine availability, minimize sudden failures, and optimize long-term maintenance cost efficiency at PT. Mitrametal Perkasa.

References

Andriani, A., & Romli, I. (2020). Preventive maintenance pada mesin die casting dengan age replacement model untuk peningkatan reliabilitas mesin. Operations Excellence: Journal of Applied Industrial Engineering, 12(1), 1. https://doi.org/10.22441/oe.2020.v12.i1.001

Made, S., Yudhyadi, I. G., Suhendi, & Kurnia, F. (2023). Pengaruh Preventive Maintenance Terhadap Peningkatkan Availability Mesin Tnl 130 A Di Pt . Morita Tjokro Gearindo Menggunakan Metode Plan Do Check Action ( PDCA ) Machine At Pt . Morita Tjokro Gearindo Uses The Plan Do Check Action ( PDCA ) Method. Journal of Industrial Engineering and Innovation, 11(1), 55–64. http://eprints.unram.ac.id/43650/2/JURNAL SUHENDI %28F1C019142%29.pdf

Sari, D. P., & Ridho, F. (2016). EVALUASI MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA MESIN BLOWING I DI PLANT I PT. PISMA PUTRA TEXTILE. In Jurnal Teknik Industri: Vol. XI (Issue 2).

Sumasto, F., Ramadhani Jiwanto, R., Handoko Purwojatmiko, B., & Rizki Pratama, I. (2023). IMPLEMENTASI PENJADWALAN PREVENTIVE MAINTENANCE UNTUK MENINGKATKAN NILAI EFEKTIVITAS MESIN PADA MESIN CNC MILLING VL-10i. Journal of Industrial View, 5, 23–35.