Analisis Lean Manufacturing Untuk Menurunkan Waste Waiting Pada Proses Assembly di PT. Z
DOI:
https://doi.org/10.61722/jssr.v3i2.3826Keywords:
Lean Manufacturing, 5S, Kanban, PDCA, Fishbone DiagramAbstract
This study aims to identify and reduce waiting waste in the assembly process of product X through the application of lean manufacturing principles. The methods employed include value stream mapping, cycle time analysis, and the implementation of 5S. Conducted at PT. Z, the results indicate several significant sources of waiting waste, such as additional movements during material disposal and retrieval, waiting for materials during the buffing process, and machine downtime during the welding bracket process. By applying lean tools such as balanced production, single minute exchange of die, and a kanban system. Furthermore, resource utilization improved, and product quality also showed enhancement. The conclusion of this research emphasizes that lean manufacturing is an effective approach to addressing waiting waste issues in the assembly process and enhancing production efficiency.
References
Pratama, R. A., & Al Faritsy, A. Z. (2024). Optimalisasi Proses Produksi Briket dengan Metode Lean Manufacturing: (Studi Kasus: CV Harico). Jurnal Teknologi dan Manajemen Industri Terapan, 3(2), 220-229.
Putra, D. A. (2019). Implementation of Lean Manufacturing with tool Value Stream Mapping Segment 1160 at PT. ETA Indonesia (Doctoral dissertation, Untag 1945 Surabaya).
Sarjono, S., & Supratman, J. (2021). Meminimasi Waste Pada Pembuatan Oil Seal Dengan Pendekatan Lean Manufacturing (Studi Kasus Proses Produksi Oil Seal Line SIM di PT. NOK Indonesia). Kocenin Serial Konferensi, (1), 2(1).
Laila, P. (2024). Penerapan Lean Manufacturing Untuk Meminimalkan Waste pada Bagian Produksi di PT. Mechmar Jaya Industri (JTII), 2(1).
Lestari, R. C., Handayani, K. F., Firmansyah, G. G., & Fauzi, M. (2022). Upaya Meminimalkan Cacat Produk Dengan Implementasi Metode Lean Six Sigma: Studi Kasus PT. XYZ. Jurnal Bayesian: Jurnal Ilmiah Statistika dan Ekonometrika, 2(1), 82-92.
Fole, A., & Kulsaputro, J. (2023). Implementasi Lean Manufacturing Untuk Mengurangi Waste Pada Proses Produksi Sirup Markisa. Journal of Industrial Engineering Innovation, 1(1), 23-29.
Wijaya, W. (2024). Penerapan Lean Manufacturing untuk Meningkatkan Efisiensi Produksi. Circle Archive, 16.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 JOURNAL SAINS STUDENT RESEARCH
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.