ANALISIS PREVENTIVE PANEL DAN GENERATOR 3 PHASA PADA PT. PERTAMINA HULU ENERGI OGAN KOMERING

Authors

  • Dinda Tri Hasanah Sihombing Universitas Negeri Medan
  • Muhammad farhan Universitas Negeri Medan
  • Reihan Akbar Sitompul Universitas Negeri Medan
  • Arwadi Sinuraya Universitas Negeri Medan
  • Desman Jonto Sinaga Universitas Negeri Medan

DOI:

https://doi.org/10.61722/jssr.v3i6.7055

Keywords:

preventive maintenance, generator, PGU panel, electrical system reliability.

Abstract

. This Industrial Internship was carried out at PT. Pertamina Hulu Energi Ogan Komering, focusing on the implementation of preventive maintenance on the electrical system, particularly the generator and Power Generation Unit (PGU) panel. The objectives of this activity were to understand the application of preventive maintenance, analyze the condition and performance of the electrical system, and evaluate the effectiveness of the maintenance program in ensuring operational reliability. The method included visual inspections, electrical parameter measurements (voltage, current, temperature, and battery voltage), as well as protection function and cooling system testing. Measurement data collected over 30 days indicated that the system operated within normal limits, with phase-to-phase voltages ranging from 375–389 V, phase currents between 23–26 A, and component temperatures between 26–27°C. The evaluation results showed that preventive maintenance successfully reduced the risk of sudden failures, extended equipment lifespan, and maintained electrical distribution efficiency. The implementation of this program proved effective in enhancing system reliability, minimizing downtime, and supporting smooth oil and gas production operations within the company.

References

Arifin, F., Anwar, A., Makmuri, M. K., Industri, T., Sains, F., Univeristas, T., & Darma, B. (2025). Analisis perawatan genset dengan menggunakan metode reliability centered maintenance di pt pertamina ep prabumulih analysis of genset maintenance using the reliability centered maintenance method at pt pertamina ep prabumulih. 8, 1569–1577.

Kim, S. Y., Kim, M. K., Choi, M. H., & Kim, D. W. (2024). Optimal preventive maintenance: Balancing reliability and costs in the electricity market. Energy Policy, 194. https://doi.org/10.1016/j.enpol.2024.114316

Pamungkas, I. B., Rachmat, H., Kurniawati, A., Studi, P., Industri, T., & Industri, F. R. (2014). PENGEMBANGAN PROGRAM PREVENTIVE MAINTENANCE DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE ( RCM II ) DAN PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS ( OEE ) DI PLANT AMMONIA PT PUPUK KUJANG 1A. 1(Rcm Ii), 99–105.

Putra, F. A. R., Nurfadillah, R. R., Sherina, T., & Nadhiroh, N. (2022). Analisis Kondisi Panel Hubung Bagi Tegangan Rendah Utama pada Jaringan Distribusi Saluran Kabel Tegangan Rendah Cluster Nashville , Kota Wisata , Cibubur Prosiding Seminar Nasional Teknik Elektro Volume 7 Tahun 2022. Seminar Nasional …, 7, 1–6. https://prosiding.pnj.ac.id/index.php/SNTE/article/view/974%0Ahttps://prosiding.pnj.ac.id/index.php/SNTE/article/download/974/508

Septiyan, R., Kasrani, M. W., & Sugeng, B. (2019). ANALISA HILANG DAYA PADA GENERATOR SINKRON 3. 4(1), 2–6.

Sinkron, G., Kva, F., Pltmg, P., Pertamina, P. T., Rokan, H., & Rantau, F. (2024). STUDI PENGARUH PERUBAHAN BEBAN TERHADAP EFISIENSI. 8(1).

Susanto, D. A., Masyita, N., Rahmadewi, R., Karawang, U. S., & Timur, T. (2023). PREVENTIVE MAINTENANCE KOMPONEN PANEL KELISTRIKAN PADA MESIN STAMPING PRESS MEKANIKAL JW31-500T PT . SEBASTIAN JAYA METAL. 11(3), 1120–1129.

Sutjipto, R., Sungkowo, H., & Epiwardi, E. (n.d.). ANALISIS KINERJA GENERATOR INDUKSI 3 FASA BERDASARKAN. 9, 91–98.

Downloads

Published

2025-11-17