150 kV PMS; Insulation Resistance; Contact Resistance.Abstract
This study aims to evaluate the condition of the isolation resistance and contact resistance of the 150 kV Bus A Selayang 1 Conductor Separator (PMS) at the Paya Geli Substation as part of the 2 and 5 year HAR maintenance program. Insulation resistance testing was performed using a TENTECH insulation tester with a test voltage of 3 kV DC, while contact resistance was measured using a micro-ohmmeter with an injection current of 100 A in accordance with KEPDIR 0520-2.K/DIR/2014. The test results showed that the insulation resistance was in the order of hundreds of gigaohms with a leakage current of around 10⁻⁹ A, so that all phases met the minimum limit of 0.5 GΩ. The contact resistance values of 43.24 µΩ, 27.09 µΩ, and 35.90 µΩ were also below the 100 µΩ threshold with very small power loss, so that the 150 kV PMS was declared to be in very good condition and operational and supported power transmission reliability, but still required periodic monitoring and maintenance to prevent performance degradation in the future.
References
Gonibala, M. A. A., Silimang, S., & Patras, L. S. (2018). Analisis Pengujian Unjuk Kerja Pemisah ( Disconnecting Switch ) di Gardu Induk 150kV Otam. Jurnal Teknik Elektro, 2, 1–10.
Hermawan, N. Y., Fajri, A. K., & Samaratungga, L. (2025). Validation Insulation Resistance Testing and Reliability Assessment of 6 kV Current Transformers for High Voltage Applications. 21(01).
IEEE Standard Definitions for Power Switchaear. (1992). IEEE Standard Definitions for Power Switchaear. IEEE Std C37.100-1992, 1992, 80.
Ivanov, D. A., Sadykov, M. F., Yaroslavsky, D. A., Golenishchev-Kutuzov, A. V., & Galieva, T. G. (2021). Non-contact methods for high-voltage insulation equipment diagnosis during operation. Energies, 14(18). https://doi.org/10.3390/en14185670
Landry, M., Turcotte, O., & Brikci, F. (2008). A complete strategy for conducting dynamic contact resistance measurements on HV circuit breakers. IEEE Transactions on Power Delivery, 23(2), 710–716. https://doi.org/10.1109/TPWRD.2008.917694
Nur Pamudji. (2014). Kepdir 0520-2 K Dir 2014.
PT PLN (Persero). (2022). Pedoman Pemeliharaan Peralatan Penyaluran Tenaga Listrik PT PLN (Persero) di Regional Jawa Madura Bali. 1–130.
Rochman, W. K. J. (2024). Kelayakan Pemisah (Disconnect Switch) 500 Kv Berdasarkan Hasil UjiTahanan Isolasi Dan Tahanan Kontak Pada Pltu Buton Adipala. Journal Of Social Science Research, 4(3), 9253–9264.
Soedjarwanto, N., Kenya Excellentia Kines, & Saka Arif Aulia. (2024). Analisis Tahanan Kontak pada Pemisah (PMS) 150 kV Berdasarkan Hasil Pemeliharaan di PT. PLN (Persero) Gardu Induk Sutami. Jurnal Teknik Ilmu Dan Aplikasi, 5(2), 34–40. https://doi.org/10.33795/jtia.v5i2.4821
Tobing, B. L. (2012). Peralatan tegangan tinggi (Edisi ke-2). Jakarta: Penerbit Erlangga.
Waghole, D. (2023). A brief review on Insulation Resistance testing. June. https://doi.org/10.37896/JBSV23.5/2140